TM 55-1945-205-10-2
0038 00 1
0038 00
OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
LIGHT TOWERS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0121 00)
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Personnel Required
Seaman 88K
PREPARATION FOR MOVEMENT - REMOVAL OF LIGHT TOWERS
REMOVE LIGHT TOWER
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
127(
The following procedures is typical for the forward and aft light tower units to be stowed in
the ISO container, except the light tower must be removed from the aft light tower unit.
1.
Prior to lowering tower, perform the following: