TM 55-1945-205-10-2
0038 00 6
0038 00
6.
Prior to moving trailer, perform the following:
a.
Remove tiedowns.
b.
Lower jacks (27) and (28).
c.
Chock tires.
d.
Swivel jacks (27) and (28) to horizontal position.
e.
Slide both outriggers (29) to stored position, install locking pins (30).
7.
Install aft light tower unit in container.
:,1*
a.
Connect trailer drawbar eye (31) to forklift truck pintle.
29
30
30
28
27
29
27