TM 55-1945-205-10-2
0047 00 1
0047 00
OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
FULL AND FORCE OPENING CONFIGURATIONS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0121 00)
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Crowbar (Item 16, WP 0119 00)
Personnel Required
Seaman 88K
Equipment Condition
Dunnage Mats Removed. (WP 0037 00)
Light Towers Removed. (WP 0038 00)
Emergency Anchor System Container Removed. (WP 0039 00)
Personnel Shelter Container Removed. (WP 0040 00)
Generator Container Removed. (WP 0041 00)
Fenders Removed. (WP 0042 00)
Safety Equipment Removed. (WP 0043 00)
Mooring Bitts And Quick Disconnects Removed. (WP 0045 00)
PREPARATION FOR MOVEMENT - DISASSEMBLY OF ALL FULL AND FORCE
OPENING CONFIGURATIONS
DISASSEMBLE PLATFORM
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
Do not handle ropes/lines by placing hands in bight of the line where it feeds into
cleats, etc. Place the hands on top or on the outside so that in an emergency the lines
can be released quickly to preclude being pulled into the equipment.
1.
Secure RRDF segment to RRDF platform with line so that segments to be separated are secured tightly
to platform.