TM 55-1945-205-10-2
0114 00 10
0114 00
3
Before
.2
Generator Container 1. Check exterior of container
for damage. If damage is found,
contact unit maintenance.
2. Check personnel access door for
proper operation. If door does not
operate properly, contact unit
maintenance.
3. Check AC lighting system for
operation and burned out bulbs. If
does not operate or bulbs are burned
out, contact unit maintenance.
4. Check DC lighting system for
operation. If DC lighting system
does not operate, contact unit
maintenance.
a. Check DC lighting system for
burned out bulbs. If DC lighting
system bulbs are burned out,
contact unit maintenance.
b. Check electrolyte level in DC
lighting system battery. Level
should be above plates in cells.
Add distilled water as necessary.
c. Ensure all DC lighting system
battery cable clamps and hold
downs are tight. Make sure all
are secure and free of corrosion.
If battery cable clamps and hold
downs are loose or corroded,
contact unit maintenance.
d. Check DC lighting system
battery charger for frayed wires
and proper operation. If DC
lighting system battery charger
has frayed wires or does not
operate, contact unit
maintenance.
Table 1. Preventive Maintenance Checks and Services. (Continued)
ITEM
NO.
INTERVAL
MAN-
HOURS
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF: