TM 55-1945-205-10-4
0021 00 1
0021 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
GENERATOR CONTAINER
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Gloves, Chemical (Item 22, WP 0104 00)
Plug, Ear (Item 40, WP 0104 00)
Materials/Parts
Antiseize Compound (Item 2, WP 0105 00)
Personnel Required
Seaman 88K
PREPARATION FOR USE - INSTALLATION OF TACTICAL QUIET GENERATOR CONTAINER ON
TRIDENT PIERHEAD
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
All personnel must wear hearing protection during tactical generator operation.
Failure to observe this precaution could result in permanent hearing loss.
1.
Lift generator container onto trident pierhead.
2.
Position generator container in desired location.
3.
Tie generator container at four corners to trident pierhead using tiedown straps.
REMOVE STEPS FROM GENERATOR CONTAINER
1.
Secure generator container access door in open position.
a.
Loosen turnbuckle on the right side of step assembly until hook is free from round bar.
b.
Remove hook from round bar and stow.
2.
Pull steps from container to allow access.