TM 55-1945-205-10-40022 00 10022 00OPERATOR MAINTENANCEFLOATING CAUSEWAYPERSONNEL SHELTEROPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Materials/PartsAntiseize Compound (Item 2, WP 0105 00)Personnel RequiredSeaman 88KEquipment ConditionGenerator Container Installed On Trident Pierhead. (WP 0021 00)PREPARATION FOR USE - INSTALLATION OF PERSONNEL SHELTERINSTALL PERSONNEL SHELTER ON TRIDENT PIERHEAD:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.127(Personnel shelter must be on the same platform section with generator container.1.Using crane, lift personnel shelter onto trident pierhead.2.Position personnel shelter in desired location.3.Tie personnel shelter at four corners to trident pierhead using tie down straps.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business