TM 55-1945-205-10-4
0036 00 4
0036 00
:,1*
3.
Using forklift or appropriate handling device, install the first stack of dunnage mats (5) in the 20 ft ISO
container (8).
4.
After installation of the first stack of dunnage mats (5), install three 4 X 4 dunnage wood blocks (7) on top of the
dunnage mats (5) to prepare for adding the two remaining stacks of dunnage mats (5).
127(
A total of twenty four mats are stored in each container.
5.
Repeat previous steps for installation of the remaining two stacks of dunnage mats in the ISO container
until all three stacks of dunnage mats are installed in the ISO container.
6.
Install ratchet strap tiedowns (9) to secure dunnage mats (5) to ISO container pallet.
7.
Install flat bars (10) on side of container to secure dunnage mats (5) in ISO container (8).
&,21
Prior to moving or lifting ISO container, ensure doors are closed and locked. Damage
to ISO container will occur if any door is open or unlocked while container is
moved or lifted.
8.
Close the ISO container (8) side doors and latch in the closed position.
END OF WORK PACKAGE