TM 55-1945-205-10-40041 00 10041 00OPERATOR MAINTENANCEFLOATING CAUSEWAYSAFETY EQUIPMENTOPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Personnel RequiredSeaman 88KPREPARATION FOR MOVEMENT - REMOVAL OF SAFETY EQUIPMENTREMOVE LIFE RINGS:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.Beware of other craft or objects coming alongside while working outboard installing the keeper plate and bolt on deck fittings as the possibility exists of falling overboard which could cause death or injury to personnel.1.Remove life ring (1) with strobe (2) from life ring bracket (3).2.Remove nuts (4) from bolts (5) and separate life ring bracket retaining clamps half (6).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business