TM 55-1945-205-10-4
0040 00 2
0040 00
a.
Connect tag lines to securing chains or lines.
b.
Disconnect fenders securing chain or lines from trident pierhead securing eyes on the mooring bitts or deck
cleat fittings.
:,1*
c.
Using the warping tug, man the tag lines and raise the 3 ft X 5 ft, 4 ft X 12 ft and 5 ft X 10 ft fender from the
water onto the FC deck.
d.
Disconnect tag lines from the ends of the securing chains or lines.
:,1*
e.
Using the crane or fork lift, place the fenders on their respective pallet.
f.
Install and tighten tiedown straps to secure fenders to pallets.
g.
Loosen cable attaching waterproof covering to ISO container.
3 FT X 5 FT LIGHTER FENDER
4 FT X 12 FT LIGHTER FENDER
5 FT X 10 FT SEALIFT VESSEL FENDER