TM 55-1945-205-10-40043 00 10043 00OPERATOR MAINTENANCEFLOATING CAUSEWAYMOORING BITTSOPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Crowbar (Item 14, WP 0104 00)Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)Chain, ½ in. General Purpose (Item 12, WP 0104 00)Forklift Adapter (Item 19, WP 0104 00)Push Rod (Item 42, WP 0104 00)Personnel RequiredSeaman 88KPREPARATION FOR MOVEMENT - REMOVAL OF MOORING BITTSREMOVE MOORING BITT:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.Attempting to remove mooring bitts from the FC in higher sea conditions than Sea State 0 could cause injury or possible death to personnel and/or damage equipment.1.Use fork lift and lift chain to support mooring bitt (1).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business