TM 55-1945-205-10-4
0044 00 1
0044 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
D-RING/CLOVERLEAF AND DECK CLEAT FITTINGS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Personnel Required
Seaman 88K
PREPARATION FOR MOVEMENT - REMOVAL OF D-RING/CLOVERLEAF AND DECK
CLEAT FITTINGS
REMOVE D-RING/CLOVERLEAF FITTINGS
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
Beware of other craft or objects coming alongside while working outboard installing
the bolt and washer. Serious injury may result if body parts are crushed between
module and other craft or objects.
Use extreme caution while working outboard and lifting heavy objects as the
possibility of falling overboard exists, which could cause serious injury or death.
1.
Remove bolt (1) and keeper plate (2) from nut (3) and tailpiece (4).