TM 55-1945-205-10-40044 00 10044 00OPERATOR MAINTENANCEFLOATING CAUSEWAYD-RING/CLOVERLEAF AND DECK CLEAT FITTINGSOPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Personnel RequiredSeaman 88KPREPARATION FOR MOVEMENT - REMOVAL OF D-RING/CLOVERLEAF AND DECK CLEAT FITTINGSREMOVE D-RING/CLOVERLEAF FITTINGS:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.Beware of other craft or objects coming alongside while working outboard installing the bolt and washer. Serious injury may result if body parts are crushed between module and other craft or objects.Use extreme caution while working outboard and lifting heavy objects as the possibility of falling overboard exists, which could cause serious injury or death.1.Remove bolt (1) and keeper plate (2) from nut (3) and tailpiece (4).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business