TM 55-1945-205-10-40045 00 50045 00e.Move hoist cable release lever (13) to unlock position.f.Place operating handle (8) on reversing lever (12) and work it back and forth to pay out hoist cable (10).g.When all tension has been relieved on hoist cable (10), on carpenter stop (3), repeat steps b through d.3.Pull mooring line (1) to the FC ramp using bulldozer (2).127(Extracting the anchor can be accomplished using forklift or manually.4.Use forklift and forklift adaptor to extract anchors (14).a.Attach one end of line to anchor crown base, link/shackle.:,1*b.Lift and raise anchor (14) out of ground.810111091312
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business