TM 55-1945-205-10-4
0045 00 1
0045 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
ONSHORE ANCHOR MOORING LEGS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Industrial (chipping, chemical) (Item 24, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)
Gloves, Chemical (Item 22, WP 0104 00)
Apron, Utility (Item 1, WP 0106 00)
Respirator, Air Filtering (Item 5, WP 0106 00)
Forklift Adaptor (Item 19, WP 0104 00)
Shovel, Hand (Item 6, WP 0104 00)
Materials/Parts
Cleaner, Type II (Item 5, WP 0105 00)
Corrosion, Preventive Compound, Class I, Grade II, (Item 6, WP 0105 00)
Corrosion, Preventive Compound, Class I, Grade II, (Item 7, WP 0105 00)
Lubricating Oil, 80W90 Grade (Item 16, WP 0105 00)
Rag, Wiping (Item 19, WP 0105 00)
Personnel Required
Seaman 88K (2)
PREPARATION FOR MOVEMENT - RECOVER ONSHORE ANCHOR MOORING LEGS
RECOVER ONSHORE ANCHOR MOORING LEGS
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
127(
The following procedure is typical for recovery and stowage of onshore anchor mooring
legs. Easing tension on mooring lines can be accomplished using either bulldozer or
carpenter stops and griphoist.
1.
Ease mooring line (1) tension using bulldozer (2).