Home
Download PDF
Order CD-ROM
Order in Print
INSTALL PERSONNEL SHELTER INCINERATOR TOILET EXHAUST FLEXIBLE COUPLINGS - TM-55-1945-205-24-2_350
PERSONNEL SHELTER FLUORESCENT LIGHT BULBS (cont)
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
271
272
273
274
275
276
277
278
279
280
281
TM 55-1945-205-24-2
0114 00 1
0114 00
UNIT LEVEL MAINTENANCE
ROLL-ON\ROLL-OFF DISCHARGE FACILITY
PERSONNEL SHELTER FLUORESCENT LIGHT BULBS
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)
Mittens, Heat Protective (Item 41, WP 0359 00)
Materials/Parts
Bulb, Fluorescent
(58536)
NSN 6280-01-456-7015
PN A50597-1
Personnel Required
Seaman 88K
References
TM 55-1945-205-10-2
REMOVE PERSONNEL SHELTER FLUORESCENT LIGHT BULBS
NOTE
The following procedure is typical for the removal and installation of all personnel shelter
fluorescent light bulbs.
1.
Verify light switch is in the off position.
WARNING
2.
Remove light cover (1).
2
1
3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business