Home
Download PDF
Order CD-ROM
Order in Print
INCINERATOR TOILET - TM-55-1945-205-24-2_347
INSTALL PERSONNEL SHELTER INCINERATOR TOILET EXHAUST FLEXIBLE COUPLINGS - TM-55-1945-205-24-2_350
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
269
270
271
272
273
274
275
276
277
278
279
TM 55-1945-205-24-2
0113 00 1
0113 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
PERSONNEL SHELTER INCINERATOR TOILET
EXHAUST
FLEXIBLE
COUPLINGS
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)
Materials/Parts
Coupling, Pipe
(81340)
PN 4511K81
Coupling, Pipe
(81340)
PN 4511K82
Qty 2
Pipe, Plastic
(81340)
PN 93908
Personnel Required
Engineer 88L
REMOVE PERSONNEL SHELTER INCINERATOR TOILET EXHAUST FLEXIBLE
COUPLINGS
1.
Loosen stainless steel band (1) between the flex reducing coupling (2) and the incinerator toilet 90° elbow (3) and
slide band (1) onto elbow (3).
2.
Loosen stainless steel band (4) between the flex reducing coupling (2) and the straight 3 in. PVC pipe (5) and slide
band (4) onto pipe (5).
3.
Remove flex reducing coupling (2) and discard.
7
9
5
2
3
1
4
6
8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business