TM 55-1945-205-24-2
0118 00 1/2 blank
0118 00
DIRECT SUPPORT MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
PERSONNEL SHELTER LOAD DISTRIBUTION
PANEL ACCESS COVER
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Item 81, WP 0359 00)
Personnel Required
Engineer 88L
Equipment Condition
Generator Shut Down. (TM 9-6115-642-10, TM 9-6115-643-10)
REMOVE PERSONNEL SHELTER LOAD DISTRIBUTION PANEL ACCESS COVER
1.
Remove four screws (1) from panel (2).
2.
Remove panel (2) from load distribution box (3).
INSTALL PERSONNEL SHELTER LOAD DISTRIBUTION PANEL ACCESS COVER
1.
Position panel (2) on load distribution box (3).
2.
Install four screws (1) through panel (2) and tighten.
END OF WORK PACKAGE
2
3
1