Home
Download PDF
Order CD-ROM
Order in Print
FILL LIGHT TOWER ENGINE RADIATOR WITH COOLANT (cont) - TM-55-1945-205-24-2_542
FLUSH LIGHT TOWER COOLING SYSTEM - TM-55-1945-205-24-2_544
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
436
437
438
439
440
441
442
443
444
445
446
TM 55-1945-205-24-2
0179 00 1
0179 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
LIGHT TOWER
COOLING SYSTEM
FLUSHING
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)
Gloves, Men’s and Women’s (Leather Palm) (Item 27, WP 0359 00)
Goggles, Sun, Wind and Dust (Safety) (Item 29, WP 0359 00)
Helmet, Safety (Brown) (Item 33, WP 0359 00)
Life Preserver, Vest (Item 38, WP 0359 00)
Gloves, Chemical (Item 25, WP 0359 00)
Goggles, Industrial (Chipping, Chemical) (Item 28, WP 0359 00)
Respirator, Air Filtering (Item 59, WP 0359 00)
Apron, Utility (Item 2, WP 0359 00)
Pan, Drain (Item 46, WP 0359 00)
Materials/Parts
Cleaning Compound, Engine
Cooling System
(Item 12, WP 0358 00)
Spill Clean-Up Kit, Hazardous Material (Item 50, WP 0358 00)
Personnel Required
Engineer 88L
References
TM 55-1945-205-10-2
Equipment Condition
Engine Cool To Touch.
Light Tower Battery Negative Lead Terminal Removed. (WP 0134 00)
FLUSH LIGHT TOWER
COOLING SYSTEM
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
1.
Remove the
radiator pressure cap
(1).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business