TM 55-1945-205-24-2
0179 00 1
0179 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
LIGHT TOWER COOLING SYSTEM
FLUSHING
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 82, WP 0359 00)
Gloves, Mens and Womens (Leather Palm) (Item 27, WP 0359 00)
Goggles, Sun, Wind and Dust (Safety) (Item 29, WP 0359 00)
Helmet, Safety (Brown) (Item 33, WP 0359 00)
Life Preserver, Vest (Item 38, WP 0359 00)
Gloves, Chemical (Item 25, WP 0359 00)
Goggles, Industrial (Chipping, Chemical) (Item 28, WP 0359 00)
Respirator, Air Filtering (Item 59, WP 0359 00)
Apron, Utility (Item 2, WP 0359 00)
Pan, Drain (Item 46, WP 0359 00)
Materials/Parts
Cleaning Compound, Engine Cooling System (Item 12, WP 0358 00)
Spill Clean-Up Kit, Hazardous Material (Item 50, WP 0358 00)
Personnel Required
Engineer 88L
References
TM 55-1945-205-10-2
Equipment Condition
Engine Cool To Touch.
Light Tower Battery Negative Lead Terminal Removed. (WP 0134 00)
FLUSH LIGHT TOWER COOLING SYSTEM
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
1.
Remove the radiator pressure cap (1).