Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Table 1. Preventive Maintenance Checks and Services - TM-55-1945-205-24-4_176
INTERMEDIATE SECTION NON-POWERED MODULE - TM-55-1945-205-24-4_179
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
121
122
123
124
125
126
127
128
129
130
131
TM 55-1945-205-24-4
0050 00 3/4 blank
0050 00
END OF WORK PACKAGE
3
50 Operating
Hours
.2
Light Tower Engine
(Cont’d)
2. After the first 50 hours of
operation, replace the engine oil
filter. (WP 0163 00)
3
100
Operating
Hours
.5
Light Tower Engine
Remove and clean air
filter element
.
(WP 0172 00)
3
200
Operating
Hours
.5
Light Tower Engine
Change engine oil. (WP 0162 00)
3
250
Operating
Hours
.3
Light Tower Engine
Repack wheel
bearings
and replace
grease seals. (WP 0191 00)
3
400
Operating
Hours
.3
Light Tower Engine
1. Replace engine oil filter.
(WP 0163 00)
2. Replace engine
fuel filter
.
(WP 0165 00)
3
500
Operating
Hours
3.0
Light Tower Engine
1. Drain
cooling system
, flush
cooling system
and install new
coolant. (WP 0175 00, WP 0176 00)
2. Replace fan belt. (WP 0180 00)
Table 1. Preventive Maintenance Checks and Services. (Continued)
ITEM
NO.
INTERVAL
MAN-
HOURS
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business