TM 55-1945-205-24-40088 00 10088 00UNIT LEVEL MAINTENANCEFLOATING CAUSEWAYPERSONNEL SHELTER SHORE TIE PENETRATION HINGED COVERREPLACEMENTINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00) Helmet, Safety (Brown) (Item 20, WP 0253 00)Life Preserver, Vest (Item 25, WP 0253 00)Materials/PartsCover, Assembly(81340)PN FC-621-001-128Personnel RequiredEngineer 88LREMOVE PERSONNEL SHELTER SHORE TIE PENETRATION HINGED COVERWARNINGAll personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.1.Remove five cover hinge screws (1) securing the cover (2) to the personnel shelter exterior wall (3).2.Remove cover (2) and discard.231
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business