TM 55-1945-205-24-4
0090 00 1
0090 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
PERSONNEL SHELTER INTERIOR DOOR
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Materials/Parts
Door, Interior
(81340)
PN FC-621-001-4
Personnel Required
Engineer 88L (2)
REMOVE PERSONNEL SHELTER INTERIOR DOOR
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
NOTE
The door hinges will remain on the door frame during door replacement.
1.
Remove four screws (1) securing hydraulic actuator (2) to door (3).
3
1
2
4
5