TM 55-1945-205-24-40090 00 10090 00UNIT LEVEL MAINTENANCEFLOATING CAUSEWAYPERSONNEL SHELTER INTERIOR DOORREPLACEMENTINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00) Helmet, Safety (Brown) (Item 20, WP 0253 00)Life Preserver, Vest (Item 25, WP 0253 00)Materials/PartsDoor, Interior(81340)PN FC-621-001-4Personnel RequiredEngineer 88L (2)REMOVE PERSONNEL SHELTER INTERIOR DOORWARNINGAll personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.NOTEThe door hinges will remain on the door frame during door replacement.1.Remove four screws (1) securing hydraulic actuator (2) to door (3).31245
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business