TM 55-1945-205-24-40092 00 10092 00UNIT LEVEL MAINTENANCEFLOATING CAUSEWAYPERSONNEL SHELTER EXTERIOR DOORREPLACEMENTINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00) Helmet, Safety (Brown) (Item 20, WP 0253 00)Life Preserver, Vest (Item 25, WP 0253 00)Materials/PartsDoor, Weathertight(06101)PN FC-621-001-2Personnel RequiredEngineer 88L (2)Equipment ConditionPersonnel Shelter Exterior Door Hasp Removed. (WP 0091 00)REMOVE PERSONNEL SHELTER EXTERIOR DOORWARNINGAll personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.NOTEThe hinges will remain on the door frame during door replacement.1.Using assistant to support weight of door (1), remove four screws (2) on each of three door hinges (3) on door side.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business