TM 55-1945-205-24-4
0098 00 3/4 blank
0098 00
WARNING
7.
Grasp the sides of the unit chassis (8) and slide it from the wall sleeve (9).
INSTALL HEATING AND AIR CONDITIONING SYSTEM CHASSIS
WARNING
1.
Grasp the sides of the unit chassis (8) and slide into wall sleeve (9).
2.
Install four 1¾ in. mounting screws (7) that secure the unit chassis (8) to the wall sleeve (9).
3.
Connect power plug assembly (6) and stow.
4.
Align access cover (5) and install screw (4) in access cover (5).
5.
Tighten screw (4).
6.
Install heating and air conditioning system indoor air filter. (WP 0097 00)
7.
Install heating and air conditioning system front cover. (WP 0096 00)
8.
Close CKT A HEAT PUMP circuit breaker (2) in personnel shelter electrical load distribution panel (3).
9.
Move mode selector switch (1) to desired position.
END OF WORK PACKAGE
8
9