TM 55-1945-205-24-4
0188 00 2
0188 00
2.
Remove muffler (4) from manifold (5).
3.
Clean old gasket material (6) from manifold (5) with a putty knife.
INSTALL LIGHT TOWER ENGINE MUFFLER
1.
Install new gasket (6) on manifold (5).
2.
Install new muffler (4) on manifold (5).
3.
Install four lock washers (2) and hex nuts (1) on studs (3). Tighten hex nuts (1).
4.
Install light tower battery negative lead terminal. (WP 0131 00)
5.
Perform operational check of light tower. (TM 55-1945-205-10-4)
END OF WORK PACKAGE
2
1
3
6
5
4