TM 55-1945-205-24-4
0190 00 1
0190 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER RUNNING GEAR WHEEL HUB
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Wrench, Torque (150-750 in. lbs) (Item 61, WP 0253 00)
Materials/Parts
Pin, Cotter
(33968)
PN 35315225
Seal
(33968)
PN 35315142
Personnel Required
Engineer 88L
Equipment Condition
Light Tower Running Gear Wheel And Tire Assembly Removed. (WP 0189 00)
REMOVE LIGHT TOWER RUNNING GEAR WHEEL HUB
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
NOTE
The following procedure is typical for the removal and installation of port and starboard
light tower wheel hubs.
1.
Remove dust cap (1) from hub (2).