INSPECT OFFSHORE ANCHOR MOORING LEG
1.
Inspect wire ropes for damage. Replace damaged parts.
2.
Inspect shackles for damaged threads. Replace damaged parts.
INSTALL OFFSHORE ANCHOR MOORING LEG
1.
Install shackles (1) on both ends of both 30 ft wire rope assemblies (4).
2.
Install shackles (1) on ends of both 150 ft wire rope assemblies (2).
3.
Connect two 150 ft wire rope assemblies (2) to swivel (3) with two shackles (1).