TM 55-1945-205-24-4
0230 00 1
0230 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
OFFSHORE ANCHOR BUOY
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Materials/Parts
Buoy, Offshore Anchor
(97403)
PN A5-W
Personnel Required
Engineer 88L (2)
REMOVE OFFSHORE ANCHOR BUOY
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
NOTE
The following procedure is typical for the removal and installation of offshore
anchor container buoys.
1.
Unlatch and open container end doors.
WARNING
Doors must be secured and latched in the open position. Failure to comply could
result in injury to personnel.
2.
Secure end doors to container sides with locking bars.