TM 55-1945-205-24-40230 00 10230 00UNIT LEVEL MAINTENANCEFLOATING CAUSEWAYOFFSHORE ANCHOR BUOYREPLACEMENTINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)Helmet, Safety (Brown) (Item 20, WP 0253 00)Life Preserver, Vest (Item 25, WP 0253 00)Materials/PartsBuoy, Offshore Anchor (97403)PN A5-WPersonnel RequiredEngineer 88L (2)REMOVE OFFSHORE ANCHOR BUOYWARNINGAll personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.NOTEThe following procedure is typical for the removal and installation of offshore anchor container buoys.1.Unlatch and open container end doors.WARNINGDoors must be secured and latched in the open position. Failure to comply could result in injury to personnel.2.Secure end doors to container sides with locking bars.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business