• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INFRARED PERISCOPE CABLE REPLACEMENT - Continued
INFRARED PERISCOPE CABLE REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  365    366    367    368    369  370  371    372    373    374    375  
img
TM 5-5420-202-20-3
TM 5-5420-226-20-3
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 5 of 6)
6.
Position cable assembly
(G) in vehicle.
7.
Thread cable assembly
(G) onto stowage
receptacle (H).
8.
Press cable (G) into
spring clamp (J)
on overhead crossbeam.
Place cable (G) in
9.
clamp (K) with har-
nesses (L) and (M).
10.
Using 7/16 inch
socket , install
screw (N) and new
lockwasher (P) to
secure clamp (K),
cable (G), and harnesses
(L) and (M) to over-
head crossbeam.
11.
Place cables (A)
and (G) inside clamp (Q).
12.
Using 7/16 inch
socket, install screw
(R) and new lockwasher
(S) to secure clamp
(Q) and ground leads
from gage indicator
and master control
panels to center post.
Go on to Sheet 6
10-295-67
6. 9
Change 6






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.