• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFTING FORWARD OUTBOARD TUBE REPLACEMENT - Continued
SHIFTING CONTROL REAR ROD AND LEVERS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  497    498    499    500    501  502  503    504    505    506    507  
img
. . . . . .
TM 5-5420-226-20-3
SHIFTING CONTROL REAR ROD AND LEVERS REPLACEMENT (Sheet 1 of 4)
PROCEDURE
INDEX
PAGE
PROCEDURE
11-35
Removal
11-37
Installation
TOOLS:
Slip joint pliers
7/16 in.open end wrench
9/16 in.open end wrench (2 required)
Flat-tip screwdriver
Spring pin MS3906-161
SUPPLIES:
Block tracks to prevent vehicle movement
PRELIMINARY PROCEDURES:
(TM 5-5420-226-10)
Place shift lever in reverse (TM 5-5420-226-10)
Remove top deck (page 16-21)
Remove transmission shroud (page 9-2)
REMOVAL:
Using pliers, remove cotter pin (A) from
1.
transmission shaft stud (B).
2.
Using 9/16 inch wrench, remove nut
and washer (C) from transmission shaft
stud (B) .
Go on to Sheet 2
11-35






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.