• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation of New Studs
Dowel Pin Installation

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  676    677    678    679    680  681  682    683    684    685    686  
img
.
TM 5-5420-228-24
GENERAL MAINTENANCE - Continued
Dowel Pin Removal
TOOLS: Slip joint pliers
Portable electric hand grinder (if required)
Portable electric drill (if required)
Twist drill set
1.
Using pliers, grip pin (A).
2.
Using pliers, pull out pin (A) with twisting motion.
3.
If unable to pull out pin (A) with pliers,
using hand grinder, grind pin (A) off flush
with surface (B).
Using electric drill and twist drill, drill out
4.
rest of pin (A).
TA251289
End of Task
C-19






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.