• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNLOADING PALLET TO GROUND (Contd) - TM-5-5420-280-100159
SPEED CONTROL LEVER, START POSITION

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  132    133    134    135    136  137  138    139    140    141    142  
TM 5-5420-280-10
0015 00
OPERATOR INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
OPERATION OF LPU FOR BRIDGE LAUNCH OR RETRIEVAL
CAUTION
Prior to disconnecting/connecting hydraulic supply hoses,
clean debris from couplings and catch residual oil with clean
rags. Failure to comply may result in damage to equipment.
NOTE
Perform steps 1 through 3 if pallet hydraulic supply hoses are
connected to CBT.
1. Disconnect pallet hydraulic supply hoses (7) and (10) from CBT hydraulic
pump hoses (8) and (9), located adjacent to LHS cabinet assembly (2) on late
model CBTs, or at rear of work platform (13) on early model CBTs.
2. Connect CBT hydraulic pump hoses (8) and (9) to LHS hydraulic supply quick-
disconnect couplings (6) and (11), located on bracket (1) on late model CBTs, or
bracket (12) on early model CBTs.
2
4
3
6
7
12
5
8
1
9
11
6
10
7
9
13
11
8
10
CBT COUPLINGS,
CBT COUPLINGS,
EARLY MODEL CBT
LATE MODEL CBT
0015 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.