• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION (Contd) - TM-5-5420-280-23-P0471
HYDRAULIC CONTROL VALVE AND SOLENOID REPLACEMENT

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  396    397    398    399    400  401  402    403    404    405    406  
TM 5-5420-280-23&P
0074 00
HYDRAULIC CONTROL VALVE MANIFOLDS REPLACEMENT (Contd)
ADJUSTMENT
1.
Install pressure hose and pressure gauge on pressure port (5) on bottom of manifld (4).
2.
Loosen jamnut (3) on pressure relief valve (1) on top of manifold (4)
3.
Start Launch Power Unit (LPU) or CBT, lock KY1 control valve in the ON position and adjust
pressure relief valve setscrew (2) until pressure gauge reads 3,263.3 PSI (225 Bar), then tighten
jamnut (3) and unlock KY1 control valve.
4.
Shut down LPU or CBT.
2
1
3
~
4
4
~
PRESSURE
5
HOSE
PRESSURE
GAUGE
END OF WORK PACKAGE
0074 00-4






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.