TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
BATTERIES AND BATTERY BOXES REPLACEMENT
PORT BATTERY BANK REMOVAL, PORT BATTERY BANK INSTALLATION,
STARBOARD BATTERY BANK REMOVAL, AND STARBOARD BANK INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Battery hatches opened and secured
(TM 5-1940-322-10).
Master switch turned OFF (TM 5-1940-322-10).
Materials/Parts
Silicone compound (item 37, WP 0210 00)
0055 00-1