TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
HEADER TANK AND RESERVOIR MAINTENANCE
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
References
Forward Repair System (FRS)
Equipment Condition
Material/Parts
Engine hatches opened and secured
(TM 5-1940-322-10).
0066 00-1