TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
References
Forward repair system (FRS)
Equipment Condition
Battery hatch opened and secured
(TM 5-1940-322-10).
Battery ground cables disconnected
Materials/Parts
Fuel supply, high-pressure, and return fuel lines
0102 00-1