TM 5-1940-322-24
SUSTAINMENT MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
ENGINE OIL PUMP MAINTENANCE
REMOVAL, DISASSEMBLY, CLEANING AND INSPECTION, ASSEMBLY, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
References
Forward Repair System (FRS)
Equipment Condition
Engine hatches opened and secured
(TM 5-1940-322-10).
Materials/Parts
Coolant reservoir and hoses removed
0153 00-1