TM 5-1940-322-24
SUSTAINMENT MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
VALVES AND VALVE SPRINGS MAINTENANCE
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
References
Forward Repair System (FRS)
Equipment Condition
Plastic hammer
Materials/Parts
0160 00-1