• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWERPLANT REPLACEMENT - Continued
POWERPLANT REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  15    16    17    18    19  20  21    22    23    24    25  
img
.
TM 5-5420-202-20-2
POWERPLANT REPLACEMENT (Sheet 17.1 of 21)
29.
Connect hydraulic brake line at quick-
disconnect.
30.
Check brake pedal travel. If pedal travel
seems too much or brakes feel "spongy",
bleed brakes (page 13-86).
31.
Remove protective coverings from openings
and connect fuel return line at quick-
d i s c o n n e c t fitting.
32.
Install shifting linkage.
33.
Put two flat sides of shifting linkage together.
Install screw (N), using 7/16 inch socket, tighten screw (N).
34.
Using pliers, install lockwire (P) through screw (N) and around shifting linkage.
35.
Go on to Sheet 18
Change 4 5-18.1/(5-18.2 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.