• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIGHT OUTER AND INNER ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES REPLACEMENT (Sheet 1 of 4)
RIGHT OUTER AND INNER ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES REPLACEMENT (Sheet 3 of 4)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  103    104    105    106    107  108  109    110    111    112    113  
img
TM 5-5420-202-20-2
RIGHT OUTER AND INNER ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES
REPLACEMENT (Sheet 2 of 4)
NOTE
Place rags or drip pan under transmission and oil cooler
adapters.
Before removing tubes and fittings, seal
powerplant openings with plastic barrier material and
masking tape to prevent unnecessary exposure to moisture
and contamination.  Remove plastic barrier material and
masking tape when installing tubes and fittings.
REMOVAL:
1.
Using 1-5/8 inch wrench to hold adapter (A), use 1-1/2 inch wrench and loosen connector
(B).
2.
Using 1-5/8 inch wrench to hold adapter (C), use 1-1/2 inch wrench and loosen connector
(D).
3.
Using hands, disconnect and remove tube (E) from powerplant.
Using 1-5/8 inch wrench, remove adapters (A and C) and gaskets (F and G). Throw gaskets
4.
away.
5.
Using 1-5/8 inch wrench to hold adapter (H), use 1-1/2 inch wrench and loosen connector
(J).
6.
Using 1-5/8 inch wrench to hold adapter (K), use 1-1/2 inch wrench and loosen connector
(L).
7.
Using hands disconnect and remove tube (M) from powerplant.
8.
Using 1-5/8 inch wrench, remove adapters (H and K) and gaskets (N and P). Throw gaskets
away.
Go on to Sheet 3
6-65


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.