• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LEFT OUTER AND INNER ENGINE-TO-TRANSMISSION OIL LINE TUBE ASSEMBLIES REPLACEMENT (Sheet 1 of 4)
LEFT OUTER AND INNER ENGINE-TO-TRANSMISSION OIL LINE TUBE ASSEMBLIES REPLACEMENT (Sheet 3 of 4)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  107    108    109    110    111  112  113    114    115    116    117  
img
TM 5-5420-202 -20-2
LEFT OUTER AND INNER ENGINE-TO-TRANSMISSION OIL LINE TUBE ASSEMBLIES
REPLACEMENT (Sheet 2 of 4)
NOTE
Place rags or drip pan under fittings (H & A and K & C).
Before removing tubes and fittings, seal powerplant
openings with plastic barrier material and masking tape to
prevent  unnecessary
exposure to moisture and
contamination.
Remove plastic barrier material and
masking tape when installing tubes and fittings.
REMOVAL:
1.
Using 1-5/8 inch wrench to hold adapter (A), use 1-1/2 inch wrench and loosen connector
(B).
2.
Using 1-5/8 inch wrench to hold adapter (C), use 1-1/2 inch wrench and loosen connector (D).
3.
Using hands disconnect and remove tube (E) from powerplant.
Using 1-5/8 inch wrench, remove adapters (A and C) and gaskets (F and G). Throw gaskets
4.
away.
5.
Using 1-5/8 inch wrench to hold adapter (H), use 1-1/2 inch wrench and loosen connector (J).
6.
Using 1-5/8 inch wrench to hold adapter (K), use 1-1/2 inch wrench and loosen connector (L).
7.
Using hands disconnect and remove tube (M) from powerplant.
8.
Using 1-5/8 inch wrench, remove adapters (H and K) and gaskets (N and P). Throw gaskets
away.
Go on to Sheet 3
6-69


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.