• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE GENERATOR REPLACEMENT - Continued
ENGINE GENERATOR REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  4    5    6    7    8  9  10    11    12    13    14  
img
TM 5-5420-202-20-3
ENGINE GENERATOR REPLACEMENT (Sheet 4 of 8)
21. Using special box wrench, loosen six nuts (AE). Do not remove nuts (AE) from
drive adapter (AF).
22.
Using two technicians, rotate generator (A) counterclockwise until openings in flange are
alined with nuts (AE).
WARNING
Generator (A) weighs approximately 100
pounds. Injury to personnel or damage to
equipment could result through careless
handling.
23.
Using two technicians, remove generator (A) by sliding it away from drive adapter (AF).
24. Remove boot clamps (AC) and boot (AD) from generator (A).
25. Using special box wrench, remove six nuts (AE).
Go on to Sheet 5
TA248950
10-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.