• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Master Battery Wiring Harness Replacement (Sheet 3 of 4)
Master Control Panel Wiring Harness Replacement (Sheet 1 of 7)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  99    100    101    102    103  104  105    106    107    108    109  
img
.
TM 5-5420-202-20-3
MASTER CONTROL PANEL REPAIR (Sheet 63 of 73)
Master Battery Wiring Harness Replacement (Sheet 4 of 4)
Apply silicone compound to all male connectors of the master battery wiring harness.
3.
Connect electrical connector (circuit 76) (E).
4.
5.
Connect lead (circuit 54A) to fuel shutoff switch (F).
Connect two leads (circuit 459A), one to master battery switch (G) and
6.
one to master battery indicator light (H).
7.
Connect lead (circuit 486) to manifold pre-heat circuit breaker (J).
Position connector (K) onto panel.
8.
9.
Using screwdriver on screw (L) and wrench on nut (M), install four
screws (L), new lockwashers (N), and nuts (M) to secure connector (K) to panel.
Install panel in vehicle (page 10-36).
10.
End of Task
TA249041
10-100


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.