TM 5-5420-202-20-3
MASTER CONTROL PANEL REPAIR (Sheet 71 of 73)
Gas Particulate And Bilge Pump Lead Assembly Replacement (Sheet 1 of 1)
SUPPLIES: Silicone compound (Item 32, Appendix D)
REMOVAL:
1.
Remove connector from bilge pump and gas particulate circuit breaker (A).
2.
Remove connector from bilge pump
switch (E).
Remove connector from Gas par
3.
switch (C).
Remove lead assembly (D) from
4.
INSTALLATION:
1.
Apply silicone compound to three
connectors on cable (D).
2.
Connect connector to bilge pump and
gas particulate circuit breaker (A).
3.
Connect connector to bilge pump switch
(B).
4.
Connect connector to gas particulate
switch (C).
5.
End of Task
TA249049