• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER RELAY CABLE ASSEMBLY REPLACEMENT (Sheet 5 of 5)
REAR ACCESSORY WIRING HARNESS REPLACEMENT (Sheet 2 of 7)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  318    319    320    321    322  323  324    325    326    327    328  
img
. . . .
TM 5-5420-202-20-3
REAR ACCESSORY WIRING HARNESS REPLACEMENT (Sheet 1 of 7)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
10-296.19
Installation
10-296.22
TOOLS:
7/16 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
Spanner wrench
Ratchet with 1/2 in. drive
SUPPLIES:
Silicone compound (Item 32, Appendix D)
Lockwashers (26 required)
REFERENCE:
TM 5-5420-202-20
PRELIMINARY PROCEDURES:
Disconnect three ground straps (page 10-268)
Remove right fuel tank (TM 5-5420-202-20)
Remove left fuel tank (TM 5-5420-202-20)
Go on to Sheet 2
1-2096.18
50-2
Change 7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.