• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNIVERSAL JOINT REPLACEMENT - Continued
UNIVERSAL JOINT REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  584    585    586    587    588  589  590    591    592    593    594  
img
TM 5-5420-202-20-3
UNIVERSAL JOINT REPLACEMENT (Sheet 5 of 7)
CAUTION
Use rope capable of picking up
and holding at least 92 Ibs.
5.
Using rope and crowbar, position universal
joint (B] into general position in vehicle.
6.
Insert alining punch through hole for one of
the screws (E), and into corresponding
transmission flange (F) screw hole to
aline universal joint.
NOTE
Turn universal joint (B) left or right to install four screws (E)
7.
Mine three remaining screw holes with transmission flange (F).
8.
Start threads of three screws (E), by hand.
Remove alining punch from fourth screw hole.
9.
Start threads of fourth screw (E), by hand.
10.
Go on to Sheet 6
TA249387
12-19


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.