• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FINAL DRIVE VENTING SYSTEM REPLACEMENT - Continued
FINAL DRIVE VENTING SYSTEM REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  595    596    597    598    599  600  601    602    603    604    605  
img
TM 5-5420-202-20-3
FINAL DRIVE VENTING SYSTEM REPLACEMENT (Sheet 7 of 10)
Using fingers, connect tube assembly (C) to tee (F).
6.
7.
Install clamp (G) onto tube assembly (H) and position tube assembly (H) onto hull.
8.
Using fingers, connect tube assembly (H) to tee (F).
9.
Using adjustable wrench to hold tee (F), and using torque wrench with 11/16 inch crowfoot, tighten tube
assembly (C and H) nuts to 75-85) lb-in (8.4-9.5
Using 7/16 inch wrench, install and tighten screw (J) and new lockwasher (K) securing clamp (G) to
10.
hull.
Go on to Sheet 8
12-30
Change 4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.