• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HYDRAULIC BRAKE SYSTEM BLEEDING - Continued
PARKING BRAKE CONTROL ASSEMBLY (ONE PIECE OR FRONT SECTION) AND LINKAGE REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  688    689    690    691    692  693  694    695    696    697    698  
img
. . . . . .
TM 5-5420-202-20-3
PARKING BRAKE CONTROL ASSEMBLY (ONE PIECE OR FRONT SECTION) AND LINKAGE REPLACEMENT
(Sheet 1 of 17)
PROCEDURE INDEX
PAGE
PROCEDURE
13-90
Removal
13-98
Installation
15/16 in. crowfoot wrench with 1/2 in. drive
TOOLS: 7/16 in. open end wrench
9/16 in. open end wrench
Adapter socket, 3/8 in. to 1/2 in. sq. drive
7/8 in. open end wrench
Torque wrench with 1/2 in. drive
15/16 in. open end wrench
(0-175 lb ft) (0-237 N.m)
8 in. adjustable wrench
9/16 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
Ratchet handle with 1/2 in. drive
1/4 in. punch
1/8 in. punch
Hammer
Slip joint pliers
Torque wrench with 3/8 in. drive (0-200 lb-in)
Flat-tip screwdriver
7/8 in. crowfoot wrench with 3/8 in. drive
SUPPLIES:
Spring pins (2 required)
Preformed packing
Black grease pencil
Sealing compound (Item 24, Appendix D)
15 ft. lacing wire (Item 61, Appendix D)
Split bushing
Lockwashers (12 required)
Two
PERSONNEL:
TM 5-5420-202-10
REFERENCE:
Block tracks to prevent vehicle movement
PRELIMINARY
PROCEDURES:
(TM 5-5420-202-10)
Place transmission shift lever in N (neutral)
(TM 5-5420-202-10)
Remove powerplant (page 5-2)
Remove operator's floor access cover (page 17-17)
Go on to Sheet 2
13-90


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.