• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRACK DRIVE SPROCKET REPAIR AND REPLACEMENT - Continued
TRACK ASSEMBLY REPLACEMENT

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  823    824    825    826    827  828  829    830    831    832    833  
img
TM 5-5420-202-20-3
TRACK DRIVE SPROCKET REPAIR AND REPLACEMENT (Sheet 9 of 9)
4.
Mount sprocket and hub assembly onto final drive studs.
Apply lubricant to nut (B) and bushing assemblies (A).
5.
Screw 10 new nuts and bushing assemblies onto studs (B).
6.
U s i n g 1-1/2 inch socket with extension and impact wrench, tighten nuts (A)
7.
alternately (in crisscross pattern).
Using torque wrench and extension, wet torque nuts in a two step procedure:
8.
a. Step 1. 100-150 lb-ft(136-203
b. Step 2. 450-460 lb-ft(610-624
9.
Install track on rear sprocket.
End of Task
Change 2
14-78


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.