• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PERSONNEL HEATER ASSEMBLY REPLACEMENT
PERSONNEL HEATER ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -4 Page Navigation
  67    68    69    70    71  72  73    74    75    76    77  
img
TM 5-5420-202-20-4
PERSONNEL HEATER ASSEMBLY REPLACEMENT (Sheet 2 of 5)
REMOVAL:
Locate electrical connection (A) at
1.
cover on personnel heater.
Disconnect cable (B).
2.
Push and pull quick-disconnect coupler
(C) to disconnect hose (D). Position drain
pan to catch fuel from hose, if necessary.
4.
Using 7/16 inch wrench, loosen coupling
clamp (E) securing exhaust pipe (F).
Remove clamp (E).
5.
Separate pipe (F) from heater.
6.
NOTE
It may be necessary to move heater left or right
to remove remaining two screws and lock-
Washers.
Using cross-tip screwdriver, remove four
7.
screws and lockwashers (G) securing heater
to duct.
TA248602
Go on to Sheet 3
18-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.