• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SMOKE GRENADE STOWAGE BOX REPLACEMENT
SMOKE GRENADE LAUNCHER FUNCTIONAL CHECK - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -4 Page Navigation
  281    282    283    284    285  286  287    288    289    290    291  
img
. .
TM 5-5420-202-20-4
SMOKE GRENADE LAUNCHER FUNCTIONAL CHECK (Sheet 1 of 3)
TEST EQUIPMENT. Multimeter
Personnel: Two
Make sure grenade dischargers
( A ) are not loaded before you
perform functional check. Be
sure MASTER BATTERY switch
(B) and grenade power switch (C)
a r e in OFF position before you
u n l o a d the dischargers.
Never
put  your  body  in  front  of
discharger
while
unloading.
Accidental firing of grenades
c o u l d hurt or kill you.
Set MASTER BATTERY switch (B)
1.
to ON.
Set grenade power switch (C) to ON.
2.
Indicator light (D) should come on.
NOTE
H a v e a h e l p e r i n s i d e  crew
operate
FIRE
compartment
SMOKE LEFT RIGHT pushbutton
switches (E) during functional
check.
Go on to Sheet 2
TA248805
22-30


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.