TM 5-5420-202-34
ENGINE REPLACEMENT
Power Takeoff Installation On Replacement Engine (Sheet 9 of 11)
31.
Place clamp (K) around hose (AH).
32.
Using 9/16 inch socket, secure clamp (K) and hose (AH) to topmost mounting stud
of power takeoff with washer (W) and nut (X).
33.
Place clamp (K) around hose (AM).
34.
Using 9/16 inch socket, secure clamp (K) and hose (AM) to engine stud (AS) with
washer and nut (R).
3-47